
Some parts of this message have been removed.
Learn more about Nabble's
security policy.
All members of the Control Framework WG,
An effort is underway to define and document a first view of the
GENI CFA.
It is based on early GENI efforts, and seeks to integrate the approaches
being used to implement the five control frameworks for the Spiral 1 prototypes.
An engineering draft of the first GENI CFA Document has been
completed, and is now ready for review by the entire WG. See: (which is a large
document in pdf format) http://groups.geni.net/geni/attachment/wiki/GeniControlFrameworkArchitecture/102008_GENI-ARCH-CP-01.4.pdf
This effort will be reviewed at the GEC3, including the technical
issues that have been identified. See this talk, planned for GEC3: http://groups.geni.net/geni/attachment/wiki/GeniControlFrameworkArchitecture/102208b%20%20SE_Report_CntrlFrameWG_GEC3.ppt
If you could read the draft CFA document before the WG
meeting at GEC3, that would be very helpful. Please note that the
engineering draft needs substantial work, to address the issues and fill in
gaps.
If you are interested in participating in this effort, please
contact the WG SE, Harry Mussman, at hmussman@...
Thanks,
Harry
Harry E. Mussman
Sr. Systems Engineer - GENI Project Office
BBN Technologies
10 Moulton Street
Cambridge, MA 02138
(617) 873-4282 - Office
(781) 266-8479 - Mobile
(617) 873-4888 - Fax
hmussman@...
www.bbn.com
_______________________________________________
control-wg mailing list
control-wg@...
http://lists.geni.net/mailman/listinfo/control-wg