|
View:
New views
1 Messages
—
Rating Filter:
Alert me
|
|
|
GENI Control Framework WG meeting at GEC3, 10/29/08, 9am - 12noonAll members of the Control Framework WG, The WG will meet at GEC3, next week, on 10/19/08. The overall agenda of GEC3 can be found at: http://www.geni.net/GEC3/GEC3-Agenda.pdf
All talks to be presented at GEC3 can be found at: http://groups.geni.net/geni/wiki/presentations
The agenda of the CF WG meeting can be found below and
on-line (latest version) at: Talks at the CF WG meeting include: SE
Report, at: http://groups.geni.net/geni/attachment/wiki/presentations/102208b%20%20SE_Report_CntrlFrameWG_GEC3.ppt
(and
more will be posted as they become available) We look forward to meeting will all of you who are able to
attend GEC3. Best wishes, Harry Harry E. Mussman Sr. Systems Engineer - GENI Project Office BBN Technologies 10 Moulton Street Cambridge, MA 02138 (617) 873-4282 - Office (781) 266-8479 - Mobile (617) 873-4888 - Fax Note: Check on-line for latest version: 3rd
GENI Engineering Conference Control Framework
Working Group Breakout Session Wednesday, October
29, 9am – 12noon. Building 20 A Agenda 1) Intro by WG Chairs: Larry Peterson and John
Wroclawski Introductions Scope
and goals of the Control Framework WG Review
of agenda Additional
topics? 2) Talks by Spiral 1 projects: a)
“Mid-Atlantic Crossroads (MAX)”. PI is Peter O’Neil at
University of Maryland / Mid-Atlantic Crossroads. This project will
provide access to an operational, regional, multi-wavelength optical network. b)
“Instrumentation and Measurement for GENI”. PI is Paul
Barford at University of Wisconsin - Madison. This project will provide a
measurement system, including a measurement service and repository module plus
measurement modules for inclusion in substrate components. c)
“Sensor Virtualization and Slivering in an Outdoor Wide-Area Wireless
GENI Sensor/Actuator Network Testbed”. PIs are Prashant Shenoy,
Deepak Ganesan, Jim Kurose and Michael Zink at University of Massachusetts
– Amherst. This project will integrate the ORCA control framework
into an existing and widely-deployed outdoor, wide-area sensor/actuator
network, including virtualizing the sensor/actuator system. d) “Digital Object
Registry”. PI is Larry Lannom at CNRI. This project is
focused on analyzing how a Digital Object Registry could be used to realize a
GENI software repository, and also study whether it could be used to realize a
GENI clearinghouse registry. 3) CF System Engineering report by GPO System
Engineer: Harry Mussman 4) “Lightning talks” and topics relevant
to WG. (Invited
by WG Chairs) Relevant
talk from another Spiral 1 project? Relevant
talk on an important issue?
5) Work plan for coming year. Goals
for the coming year (WG Chairs) Discussion
of work plan, and suggestions from the floor (All WG members) Recommendations
for collaborators and authors (All WG members) 6) Meeting wrap-up. Review
of action items (GPO Systems Engineer) Conclusions
(WG Chairs) _______________________________________________ control-wg mailing list control-wg@... http://lists.geni.net/mailman/listinfo/control-wg |
| Free embeddable forum powered by Nabble | Forum Help |