Interface/overlap with other working groups

View: New views
2 Messages — Rating Filter:   Alert me  

Interface/overlap with other working groups

by Kristin Rauschenbach :: Rate this Message:

Reply to Author | View Threaded | Show Only this Message

Interface/overlap with other working groups

All,

Attached are my notes from the GEC working group meeting discussion about the overlap between substrate and the other working groups.  The notes on these slides are based on a review of my notes and the audio from the session.  Please check that any items you feel strongly about in this regard are appropriately represented.  I will add your input to the notes before posting these materials.

The session made it clear that there is a significant need for exchange between substrate and the other working groups.  There are some near term questions that need to be addressed, and, as the design matures more detailed interactions and formalized mutual design efforts will become necessary.  The notes here are not intended to be a complete picture of the interfaces and interactions, but rather a starting point for future activities.

One action item from this session is that the GPO needs to establish a mechanism to facilitate the information exchanges that are called out in this summary.  This will likely take the form of documentation as well as representatives that can act as liaisons between groups.  The system engineers will take on a large share of this responsibility.   Once the mechanism(s) is established, we can further prioritize specific topics and establish a timeline for the interactions.   I welcome your ideas, and expect to work this issue with Aaron Falk in the near term. 

 
Kristin
<<...>>
************************************
Kristin Rauschenbach
BBN Technologies
617-873-8005




_______________________________________________
substrate-wg mailing list
substrate-wg@...
http://lists.geni.net/mailman/listinfo/substrate-wg

WG-overlap3.ppt (64K) Download Attachment

Re: Interface/overlap with other working groups

by Heidi Picher Dempsey-2 :: Rate this Message:

Reply to Author | View Threaded | Show Only this Message


On Nov 2, 2007, at 3:35 PM, Kristin Rauschenbach wrote:

> All,
>
> Attached are my notes from the GEC working group meeting discussion
> about the overlap between substrate and the other working groups.  The
> notes on these slides are based on a review of my notes and the audio
> from the session.  Please check that any items you feel strongly about
> in this regard are appropriately represented.  I will add your input
> to the notes before posting these materials.

The OMIS working group identified some of the same overlaps that the
substrate working group did.  Security, data collection and management,
and slice management were major topics of discussion with identified
overlaps in our group.  Separating the experimental changes in the
network from the operational changes was reported as already being a
problem on existing research networks, and it will be more challenging
on GENI.

I also sent our meeting notes to the OMIS working group to get more
input before posting them on geni.net, but if anyone in this group
would like to look at the advance draft,  they are in the OMIS mailing
list archives:

http://lists.geni.net/pipermail/omis-wg/2007-November/000008.html


>
> The session made it clear that there is a significant need for
> exchange between substrate and the other working groups. 

Same for OMIS.  We want to see some joint working group sessions, and
liasons working some of these issues also.  I'll ask the OMIS members
to take a look at your notes and post to your list to get some exchange
started.

> There are some near term questions that need to be addressed, and, as
> the design matures more detailed interactions and formalized mutual
> design efforts will become necessary.  The notes here are not intended
> to be a complete picture of the interfaces and interactions, but
> rather a starting point for future activities.
>
> One action item from this session is that the GPO needs to establish a
> mechanism to facilitate the information exchanges that are called out
> in this summary.  This will likely take the form of documentation as
> well as representatives that can act as liaisons between groups.  The
> system engineers will take on a large share of this responsibility.  
> Once the mechanism(s) is established, we can further prioritize
> specific topics and establish a timeline for the interactions.   I
> welcome your ideas, and expect to work this issue with Aaron Falk in
> the near term. 
>
>  
> Kristin
>  <<...>>
> ************************************
> Kristin Rauschenbach
> BBN Technologies
> 617-873-8005
>
> <WG-overlap3.ppt>_______________________________________________
> substrate-wg mailing list
> substrate-wg@...
> http://lists.geni.net/mailman/listinfo/substrate-wg


_______________________________________________
substrate-wg mailing list
substrate-wg@...
http://lists.geni.net/mailman/listinfo/substrate-wg