« Return to Thread: Oberheim engineering change orders (ECO)

Oberheim engineering change orders (ECO)

by Chris Strellis-2 :: Rate this Message:

Reply (Restricted by the Administrator) | Reply to Author | View in Thread

Guys,

A long shot but does anyone have a scan or the original for numbers 1116
and/or 1117.

It's for the DPX-1 EPROM upgrade.

Many thanks in advance

Chris

 « Return to Thread: Oberheim engineering change orders (ECO)