Oberheim engineering change orders (ECO)

View: New views
2 Messages — Rating Filter:   Alert me  

Oberheim engineering change orders (ECO)

by Chris Strellis-2 :: Rate this Message:

Reply (Restricted by the Administrator) | Reply to Author | View Threaded | Show Only this Message

Guys,

A long shot but does anyone have a scan or the original for numbers 1116
and/or 1117.

It's for the DPX-1 EPROM upgrade.

Many thanks in advance

Chris


Parent Message unknown Re: Oberheim engineering change orders (ECO)

by john mahoney :: Rate this Message:

Reply (Restricted by the Administrator) | Reply to Author | View Threaded | Show Only this Message

At 10:05 AM 6/30/2009, Chris Strellis wrote:

>Guys,
>
>A long shot but does anyone have a scan or the original for numbers 1116
>and/or 1117.
>
>It's for the DPX-1 EPROM upgrade.
>
>Many thanks in advance
>
>Chris


Tom Oberheim, perhaps?

John